construction lifter sc200 building elevator lift
The SC200 is a type of construction hoist or personnel and material lift commonly used on building construction sites. It is designed to efficiently transport workers, tools, and materials to various heights of a building under construction. Here's a closer look at the SC200 building elevator lift:
Key Features and Specifications:
Model Designation: SC stands for "Construction Hoist" in Chinese (施工升降机), and the "200" typically refers to the rated loading capacity, which in this case is usually 2000 kg (around 4400 pounds).
Personnel and Material Transport: The SC200 is versatile, capable of carrying both personnel and construction materials simultaneously, which enhances work efficiency on the site.
Speed: These lifts usually operate at a speed ranging from 36 to 96 meters per minute, depending on the manufacturer and specific model configuration. This allows for quick and safe vertical transportation within the construction site.
Cage Size: The cage or platform size varies but is designed to accommodate both people and materials comfortably and safely. Common dimensions might be around 3m x 1.5m (approximately 10 feet x 5 feet) with safety gates and handrails.
Rope System: Most SC200 lifts employ a dual-rope system for added safety and stability during operation. This ensures that even if one rope fails, the other can still support the load.
Drive System: They are often powered by electric motors, which are efficient and reliable. Some models may offer variable frequency drive (VFD) systems for smoother starts and stops, enhancing passenger comfort and equipment longevity.
Safety Features: Essential safety features include overload protection, emergency stop buttons, fall arrest devices, interlocks to prevent operation under unsafe conditions, and overspeed governors.
Installation and Mobility: The SC200 hoists are typically anchored to the building as it rises, with mast sections added as needed. They can be dismantled and moved to different sites once the project is completed.
Selecting and Operating an SC200 Elevator Lift:
When choosing an SC200 lift for your construction project, consider factors such as the required lifting height, site conditions, and any specific safety regulations in your region. It's crucial to work with a reputable manufacturer or rental company that provides quality equipment, adheres to safety standards, and offers technical support and maintenance services.
Ensure that operators are properly trained and follow all safety guidelines and regulations. Regular inspections and maintenance are vital to maintaining the safe and efficient operation of the hoist throughout the project duration.
Item | Unit | SC100 | SC100/100 | SC200 | SC200 Standard Model | SC200/200 Efficient Model |
Rating loading capacity | KG | 1000 | 2 x 1000 | 2000 | 2 x 2000 | 2 x 2000 |
Passengers | Person | 10 | 20 | 20 | 40 | 40 |
Lifting Speed | M/Min | 34.4 | 34.4 | 34.4 | 34.4 | 30 |
Cage Size(LxWxH) | M | 3.2 x 1.5 x 2.6 3.2 x 1.3 x 2.6 | ||||
Motor Power | KW | 2 x 11 | 2 x 2 x 11 | 3 x 11 | 2 x 3 x 11 | 2 x 2 x 15 |
Rated Brake Load of Speed Governor | K/N | 30 | 40 | |||
Max Lifting Height | M | 150-200 | ||||
Mast Weight | KG | 158/172 | ||||
Motor Braking Torque |
NM |
120 | ||||
Rated Erection Load | KG | 200 | ||||
Mast Section Size(LxWxH) | M | 0.65 x 0.65 x 1.508 0.8 x 0.8 x 1.508 |
Characteristics | Model | RatedLoading | Lifting Speed | Motor Power | |
---|---|---|---|---|---|
Double Cages | Lower-speed | SC200/200D | 2x2000kg | 0-40m/min | 2x(3x11kw) 2x(3 x8.5kw) |
SC100/100D | 2x1000kg | 0-40m/min | 2x(2x13kw) | ||
Mid-speed | SC200/200Z | 2x2000kg | 0-60m/min | 2x(2x23kw) | |
sC100/100Z | 2x1000kg | 0-60m/min | 2x(2x15kw) | ||
Single Cage |
Lower-speed | SC200D | 2000kg | 0-40m/min | 3x11kw 3 x8.5kw |
SC100D | 1000kg | 0-40m/min | 2x13kw | ||
Mid-speed | SC200Z | 2000kg | 0-60m/min | 2x23kw | |
SC100Z | 1000kg | 0-90m/min | 3x23kw |
Installation and Maintenance: Construction hoists are installed within the building or at the construction site using a hoist shaft or temporary structure. The installation process involves securing guide rails, assembling the drive machinery, and installing the carriages. Regular maintenance and inspections are essential to ensure the safe and reliable operation of the hoist. This includes routine checks of the electrical systems, mechanical components, safety devices, and compliance with relevant safety regulations.
1.High quality of motor, low noise NORD Brand ,Schneider Control
2.Strong load ability, low voltage start
3.Reasonable optimization design, compact structure, convenient installation and debugging
4.Running the lift elevator before the delivery
5.Driving mechanism refueling debugging, customer without refueling
6.Selects the high quality gear reducer and anti dropping device
Q1: Are you a trading company or a factory?
A1: We are a trading company and have our own factory. We have both the price advantage of the factory and the thoughtful service of the trading company; and the advantage of taking responsibility.
Q2: How long is your delivery time?
A2: If the goods are in stock, usually 5-10 days. Or if the goods are not in stock, then 15-20 days, depending on the quantity.
Q3: Do you provide samples ?
A3: In this field, we seldom provide samples, but it depands.
Q4:Why choose us?
A4: First,our product quality assurance and warranty for one year, steel structure warranty for lifetime and the price is cheap ;Second,we have 11 years of industry experience, so we are very professional.
Q5:Can we visiting your factory?
A5: We warmly welcome your visiting.
Send your inquiry directly to us