Place of Origin:
China
Brand Name:
Sinocorp
Model Number:
SC200
Contact Us
construction lifter sc200/200 sc200 building hoist building elevator hoist
Key Advantages of SC200/200 Building Hoist:
Increased Productivity: With two independent cages capable of operating simultaneously, the SC200/200 significantly boosts the transportation capacity of both workers and materials, leading to faster workflow and project progress.
Efficient Resource Utilization: By separating personnel from materials or dedicating one cage for heavy loads and another for lighter ones, the hoist optimizes usage, reduces waiting times, and enhances work safety.
Flexibility: The dual-cage system allows for customization of operations. For example, one cage can be dedicated to transporting personnel during peak working hours, while the other focuses on material handling, or both can be used in harmony to cater to varying demands throughout the day.
Cost-Effective: Despite a higher initial investment compared to single-cage hoists, the SC200/200 can result in overall cost savings through increased efficiency, reduced downtime, and the ability to handle more tasks concurrently.
Safety Features: As with any personnel elevator, safety is paramount. SC200/200 hoists are equipped with safety measures like overload protection, emergency braking systems, interlocks, and fall arrest devices to ensure secure operations.
Operational Aspects:
Installation: These hoists are typically anchored to the building structure using brackets and tied into the building’s safety system. Professional installation by certified technicians is crucial to ensure stability and safety.
Operation and Control: Modern SC200/200 hoists often feature user-friendly control panels, allowing for precise and smooth operation. They may also incorporate variable frequency drives (VFDs) for soft start and stop functions, enhancing passenger comfort and equipment lifespan.
Maintenance: Regular maintenance, including lubrication, cable inspection, and functional checks of safety devices, is mandatory to maintain optimal performance and safety standards.
Adaptability: The hoist's mast sections can be added or removed to adjust its height as the building grows taller, ensuring continuous vertical access throughout the construction phase.
Item | Unit | SC100 | SC100/100 | SC200 | SC200 Standard Model | SC200/200 Efficient Model |
Rating loading capacity | KG | 1000 | 2 x 1000 | 2000 | 2 x 2000 | 2 x 2000 |
Passengers | Person | 10 | 20 | 20 | 40 | 40 |
Lifting Speed | M/Min | 34.4 | 34.4 | 34.4 | 34.4 | 30 |
Cage Size(LxWxH) | M | 3.2 x 1.5 x 2.6 3.2 x 1.3 x 2.6 | ||||
Motor Power | KW | 2 x 11 | 2 x 2 x 11 | 3 x 11 | 2 x 3 x 11 | 2 x 2 x 15 |
Rated Brake Load of Speed Governor | K/N | 30 | 40 | |||
Max Lifting Height | M | 150-200 | ||||
Mast Weight | KG | 158/172 | ||||
Motor Braking Torque |
NM |
120 | ||||
Rated Erection Load | KG | 200 | ||||
Mast Section Size(LxWxH) | M | 0.65 x 0.65 x 1.508 0.8 x 0.8 x 1.508 |
Characteristics | Model | RatedLoading | Lifting Speed | Motor Power | |
---|---|---|---|---|---|
Double Cages | Lower-speed | SC200/200D | 2x2000kg | 0-40m/min | 2x(3x11kw) 2x(3 x8.5kw) |
SC100/100D | 2x1000kg | 0-40m/min | 2x(2x13kw) | ||
Mid-speed | SC200/200Z | 2x2000kg | 0-60m/min | 2x(2x23kw) | |
sC100/100Z | 2x1000kg | 0-60m/min | 2x(2x15kw) | ||
Single Cage |
Lower-speed | SC200D | 2000kg | 0-40m/min | 3x11kw 3 x8.5kw |
SC100D | 1000kg | 0-40m/min | 2x13kw | ||
Mid-speed | SC200Z | 2000kg | 0-60m/min | 2x23kw | |
SC100Z | 1000kg | 0-90m/min | 3x23kw |
Installation and Maintenance: Construction hoists are installed within the building or at the construction site using a hoist shaft or temporary structure. The installation process involves securing guide rails, assembling the drive machinery, and installing the carriages. Regular maintenance and inspections are essential to ensure the safe and reliable operation of the hoist. This includes routine checks of the electrical systems, mechanical components, safety devices, and compliance with relevant safety regulations.
1.High quality of motor, low noise NORD Brand ,Schneider Control
2.Strong load ability, low voltage start
3.Reasonable optimization design, compact structure, convenient installation and debugging
4.Running the lift elevator before the delivery
5.Driving mechanism refueling debugging, customer without refueling
6.Selects the high quality gear reducer and anti dropping device
Q1: Are you a trading company or a factory?
A1: We are a trading company and have our own factory. We have both the price advantage of the factory and the thoughtful service of the trading company; and the advantage of taking responsibility.
Q2: How long is your delivery time?
A2: If the goods are in stock, usually 5-10 days. Or if the goods are not in stock, then 15-20 days, depending on the quantity.
Q3: Do you provide samples ?
A3: In this field, we seldom provide samples, but it depands.
Q4:Why choose us?
A4: First,our product quality assurance and warranty for one year, steel structure warranty for lifetime and the price is cheap ;Second,we have 11 years of industry experience, so we are very professional.
Q5:Can we visiting your factory?
A5: We warmly welcome your visiting.
Send your inquiry directly to us