Place of Origin:
China
Brand Name:
Sinocorp
Model Number:
SC200
Contact Us
construction lifter sc200 building elevator lift
Efficiency and Speed: Construction elevators significantly speed up the movement of workers and materials between different levels of a building site, contributing to overall project timelines and productivity.
High Capacity: With the ability to carry heavy loads, typically ranging from several hundred kilograms to several tons, construction elevators can transport large quantities of materials, such as concrete, steel, and equipment, in a single trip.
Safety: Equipped with advanced safety features like overload sensors, emergency brakes, interlocking gates, and fall protection systems, construction elevators prioritize worker safety during transport.
Versatility: Available in various sizes and configurations, they can be tailored to suit different project needs, whether it's for high-rise buildings, bridge construction, or industrial sites.
Cost-Effectiveness: While the initial setup cost can be high, the time saved in material handling and personnel movement often results in significant long-term cost savings for the project.
Ease of Installation and Dismantling: Many models are designed for quick assembly, relocation, and disassembly, making them suitable for multi-stage projects or temporary installations.
Weather Resistance: Built to withstand harsh weather conditions, construction elevators ensure continuous operation even in adverse environments, keeping the project on schedule.
Energy Efficiency: Modern construction elevators often incorporate energy-saving technologies, such as variable frequency drives, reducing energy consumption and operating costs.
Compliance with Standards: Meeting international safety and quality standards (e.g., EN, ASME, ISO), they provide assurance of reliable and safe operation.
Improved Worker Morale: By providing a comfortable and safe means of accessing heights, construction elevators help maintain worker well-being and satisfaction, leading to a more productive workforce.
Reduced Site Congestion: By centralizing the transport of people and materials, construction elevators minimize the need for multiple lifting points and ground-level congestion, improving site organization and safety.
Item | Unit | SC100 | SC100/100 | SC200 | SC200 Standard Model | SC200/200 Efficient Model |
Rating loading capacity | KG | 1000 | 2 x 1000 | 2000 | 2 x 2000 | 2 x 2000 |
Passengers | Person | 10 | 20 | 20 | 40 | 40 |
Lifting Speed | M/Min | 34.4 | 34.4 | 34.4 | 34.4 | 30 |
Cage Size(LxWxH) | M | 3.2 x 1.5 x 2.6 3.2 x 1.3 x 2.6 | ||||
Motor Power | KW | 2 x 11 | 2 x 2 x 11 | 3 x 11 | 2 x 3 x 11 | 2 x 2 x 15 |
Rated Brake Load of Speed Governor | K/N | 30 | 40 | |||
Max Lifting Height | M | 150-200 | ||||
Mast Weight | KG | 158/172 | ||||
Motor Braking Torque |
NM |
120 | ||||
Rated Erection Load | KG | 200 | ||||
Mast Section Size(LxWxH) | M | 0.65 x 0.65 x 1.508 0.8 x 0.8 x 1.508 |
Characteristics | Model | RatedLoading | Lifting Speed | Motor Power | |
---|---|---|---|---|---|
Double Cages | Lower-speed | SC200/200D | 2x2000kg | 0-40m/min | 2x(3x11kw) 2x(3 x8.5kw) |
SC100/100D | 2x1000kg | 0-40m/min | 2x(2x13kw) | ||
Mid-speed | SC200/200Z | 2x2000kg | 0-60m/min | 2x(2x23kw) | |
sC100/100Z | 2x1000kg | 0-60m/min | 2x(2x15kw) | ||
Single Cage |
Lower-speed | SC200D | 2000kg | 0-40m/min | 3x11kw 3 x8.5kw |
SC100D | 1000kg | 0-40m/min | 2x13kw | ||
Mid-speed | SC200Z | 2000kg | 0-60m/min | 2x23kw | |
SC100Z | 1000kg | 0-90m/min | 3x23kw |
Installation and Maintenance: Construction hoists are installed within the building or at the construction site using a hoist shaft or temporary structure. The installation process involves securing guide rails, assembling the drive machinery, and installing the carriages. Regular maintenance and inspections are essential to ensure the safe and reliable operation of the hoist. This includes routine checks of the electrical systems, mechanical components, safety devices, and compliance with relevant safety regulations.
1.High quality of motor, low noise NORD Brand ,Schneider Control
2.Strong load ability, low voltage start
3.Reasonable optimization design, compact structure, convenient installation and debugging
4.Running the lift elevator before the delivery
5.Driving mechanism refueling debugging, customer without refueling
6.Selects the high quality gear reducer and anti dropping device
Q1: Are you a trading company or a factory?
A1: We are a trading company and have our own factory. We have both the price advantage of the factory and the thoughtful service of the trading company; and the advantage of taking responsibility.
Q2: How long is your delivery time?
A2: If the goods are in stock, usually 5-10 days. Or if the goods are not in stock, then 15-20 days, depending on the quantity.
Q3: Do you provide samples ?
A3: In this field, we seldom provide samples, but it depands.
Q4:Why choose us?
A4: First,our product quality assurance and warranty for one year, steel structure warranty for lifetime and the price is cheap ;Second,we have 11 years of industry experience, so we are very professional.
Q5:Can we visiting your factory?
A5: We warmly welcome your visiting.
Send your inquiry directly to us