Key Features of a 2-Ton Single Cage Construction Lift
Load Capacity: The lift is designed to carry up to 2 metric tons (approximately 2.2 US tons or 1.96 long tons) of material and/or personnel per cage.
Single Cage Configuration: Unlike double cage lifts, this type has only one cage, which simplifies the design and potentially reduces costs while still providing significant lifting capacity.
Structure: Constructed with sturdy materials to ensure durability and reliability. High-strength steel is commonly used for the frame and the cage itself.
Safety Features: Incorporates several safety mechanisms, such as:
Emergency Braking Systems: To stop the lift immediately in case of emergencies.
Limit Switches: To prevent overtravel of the cage.
Overload Protection: To ensure the lift does not exceed its rated capacity.
Anti-Fall Devices: To prevent the cage from falling if the hoisting cable fails.
Controls: Typically includes a simple control panel within the cage, allowing for straightforward operation by trained personnel.
Modular Design: May be designed in a modular fashion, making it easier to assemble and disassemble as needed.
Applications
These lifts are particularly useful in:
High-Rise Construction: Ideal for projects where materials need to be moved to great heights.
Renovation Projects: Suitable for refurbishing existing structures where vertical access is required.
Industrial Construction: Applicable in factory settings or other industrial constructions where heavy materials are used.
Benefits
Reliability: Built to withstand frequent use and harsh construction site conditions.
Cost-Effectiveness: Often more affordable than larger multi-cage systems while still providing substantial lifting capacity.
Versatility: Can be adapted for different construction scenarios and building heights.
Safety: Designed with numerous safety features to protect workers and materials.
Technical Specifications
Max Load: 2,000 kg (2 metric tons).
Speed: Typically ranges from 15 to 60 meters per minute, depending on the model.
Max Height: Can vary widely depending on the model, but some can reach up to 200 meters or more.
Power Source: Usually electrically powered, though some models may use hydraulic systems.
Item | Unit | SC100 | SC100/100 | SC200 | SC200 Standard Model | SC200/200 Efficient Model |
Rating loading capacity | KG | 1000 | 2 x 1000 | 2000 | 2 x 2000 | 2 x 2000 |
Passengers | Person | 10 | 20 | 20 | 40 | 40 |
Lifting Speed | M/Min | 34.4 | 34.4 | 34.4 | 34.4 | 30 |
Cage Size(LxWxH) | M | 3.2 x 1.5 x 2.6 3.2 x 1.3 x 2.6 | ||||
Motor Power | KW | 2 x 11 | 2 x 2 x 11 | 3 x 11 | 2 x 3 x 11 | 2 x 2 x 15 |
Rated Brake Load of Speed Governor | K/N | 30 | 40 | |||
Max Lifting Height | M | 150-200 | ||||
Mast Weight | KG | 158/172 | ||||
Motor Braking Torque |
NM |
120 | ||||
Rated Erection Load | KG | 200 | ||||
Mast Section Size(LxWxH) | M | 0.65 x 0.65 x 1.508 0.8 x 0.8 x 1.508 |
Characteristics | Model | RatedLoading | Lifting Speed | Motor Power | |
---|---|---|---|---|---|
Double Cages | Lower-speed | SC200/200D | 2x2000kg | 0-40m/min | 2x(3x11kw) 2x(3 x8.5kw) |
SC100/100D | 2x1000kg | 0-40m/min | 2x(2x13kw) | ||
Mid-speed | SC200/200Z | 2x2000kg | 0-60m/min | 2x(2x23kw) | |
SC100/100Z | 2x1000kg | 0-60m/min | 2x(2x15kw) | ||
Single Cage |
Lower-speed | SC200D | 2000kg | 0-40m/min | 3x11kw 3 x8.5kw |
SC100D | 1000kg | 0-40m/min | 2x13kw | ||
Mid-speed | SC200Z | 2000kg | 0-60m/min | 2x23kw | |
SC100Z | 1000kg | 0-90m/min | 3x23kw |
Installation and Maintenance: Construction hoists are installed within the building or at the construction site using a hoist shaft or temporary structure. The installation process involves securing guide rails, assembling the drive machinery, and installing the carriages. Regular maintenance and inspections are essential to ensure the safe and reliable operation of the hoist. This includes routine checks of the electrical systems, mechanical components, safety devices, and compliance with relevant safety regulations.
1.High quality of motor, low noise NORD Brand ,Schneider Control
2.Strong load ability, low voltage start
3.Reasonable optimization design, compact structure, convenient installation and debugging
4.Running the lift elevator before the delivery
5.Driving mechanism refueling debugging, customer without refueling
6.Selects the high quality gear reducer and anti dropping device
Q1: Are you a trading company or a factory?
A1: We have our own factory. We have both the price advantage of the factory and the thoughtful service of the trading company; and the advantage of taking responsibility.
Q2: How long is your delivery time?
A2: If the goods are in stock, usually 5-10 days. Or if the goods are not in stock, then 15-20 days, depending on the quantity.
Q3: Do you provide samples ?
A3: In this field, we seldom provide samples, but it depands.
Q4:Why choose us?
A4: First,our product quality assurance and warranty for one year, steel structure warranty for lifetime and the price is cheap ;Second,we have 11 years of industry experience, so we are very professional.
Q5:Can we visiting your factory?
A5: We warmly welcome your visiting.
Send your inquiry directly to us