Home > products > Construction Hoist >
New Sc200 Building Elevator Lift Construction Hoist

New Sc200 Building Elevator Lift Construction Hoist

New hoist building elevator lift

building elevator lift

Construction Hoist building elevator lift

Place of Origin:

China

Brand Name:

Sinocorp

Model Number:

SC200

Contact Us

Request A Quote
Product Details
Rated Loading Capacity(kg):
2000 * 2 Kg
Material:
G350 Steel
Hoisting Motor:
3*11kw
Electra Control System:
Schneider
Color:
Customized
Lift Type:
Rack And Pinion
Power Supply:
380V 50HZ Or Customized
Max Height:
400M With Reinforced Mast
Surface Treatment:
Hot Galvanized/Painting
Mast Section:
650*650*1508(mm) Weight:146Kg Q345
Cage Size:
3mx2.2mx1.5m
Payment & Shipping Terms
Minimum Order Quantity
1
Price
53289
Delivery Time
180 work days
Payment Terms
T/T, L/C
RELATED PRODUCTS
Contact Us
Product Description

Technical Specifications
Capacity per Cage: 2,000 kg (approximately 2 tons)
Maximum Speed: Typically operates at speeds ranging from 36 to 96 meters per minute (m/min), depending on the model and configuration.
Maximum Height: The maximum lifting height can be several hundred meters, and it can be extended as the building grows taller.
Power Requirements: Usually requires a three-phase electrical supply, but specifics can vary by manufacturer.
Dimensions: The size of the cabin and the overall dimensions of the hoist will vary by manufacturer but are designed to be spacious enough for efficient movement of people and materials.
Key Features
Dual Cage System: Two cages that can be operated independently or simultaneously, allowing for increased productivity.
Safety Mechanisms: Equipped with multiple safety features such as automatic speed governors, emergency stop mechanisms, and overload protection systems.
Enclosed Cabs: Provide protection against weather elements and improve the comfort and safety of the ride for workers.
Modular Design: Easy to assemble and disassemble, making it adaptable for different construction projects and locations.
User-Friendly Controls: Modern SC200 hoists often include advanced control systems with digital displays and intuitive interfaces.

Product Description

Here is our model:

Item Unit SC100 SC100/100 SC200 SC200 Standard Model SC200/200 Efficient Model
Rating loading capacity KG 1000 2 x 1000 2000 2 x 2000 2 x 2000
Passengers Person 10 20 20 40 40
Lifting Speed M/Min 34.4 34.4 34.4 34.4 30
Cage Size(LxWxH) M 3.2 x 1.5 x 2.6                                 3.2 x 1.3 x 2.6
Motor Power KW 2 x 11 2 x 2 x 11 3 x 11 2 x 3 x 11 2 x 2 x 15
Rated Brake Load of Speed Governor K/N 30 40
Max Lifting Height M 150-200
Mast Weight KG 158/172
Motor Braking Torque

NM

120
Rated Erection Load KG 200
Mast Section Size(LxWxH) M 0.65 x 0.65 x 1.508         0.8 x 0.8 x 1.508

 

Characteristics       Model RatedLoading Lifting Speed Motor Power
Double Cages Lower-speed SC200/200D 2x2000kg 0-40m/min 2x(3x11kw)       2x(3 x8.5kw)
SC100/100D 2x1000kg 0-40m/min 2x(2x13kw)
Mid-speed SC200/200Z 2x2000kg 0-60m/min 2x(2x23kw)
sC100/100Z 2x1000kg 0-60m/min 2x(2x15kw)

Single

Cage

Lower-speed SC200D 2000kg 0-40m/min 3x11kw         3 x8.5kw
SC100D 1000kg 0-40m/min 2x13kw
Mid-speed SC200Z 2000kg 0-60m/min 2x23kw
SC100Z 1000kg 0-90m/min 3x23kw

Temporary or Permanent Installation: Construction hoists can be either temporarily or permanently installed. Temporary hoists are commonly used during the construction phase and are dismantled once the project is completed. Permanent hoists, on the other hand, are designed for long-term use in buildings where vertical transportation is required even after construction, such as in high-rise buildings or multi-story structures.

Product Display                                                                                                                                                                    

New Sc200 Building Elevator Lift Construction Hoist 0New Sc200 Building Elevator Lift Construction Hoist 1

Installation and Maintenance: Construction hoists are installed within the building or at the construction site using a hoist shaft or temporary structure. The installation process involves securing guide rails, assembling the drive machinery, and installing the carriages. Regular maintenance and inspections are essential to ensure the safe and reliable operation of the hoist. This includes routine checks of the electrical systems, mechanical components, safety devices, and compliance with relevant safety regulations.

Our Advantage

 

1.High quality of motor, low noise NORD Brand ,Schneider Control
2.Strong load ability, low voltage start
3.Reasonable optimization design, compact structure, convenient installation and debugging
4.Running the lift elevator before the delivery
5.Driving mechanism refueling debugging, customer without refueling
6.Selects the high quality gear reducer and anti dropping device

 

Packaging & Shipping

 New Sc200 Building Elevator Lift Construction Hoist 2

Producing & Factory Environment

New Sc200 Building Elevator Lift Construction Hoist 3

New Sc200 Building Elevator Lift Construction Hoist 4

FAQ

 

Q1: Are you a trading company or a factory?
A1: We are a trading company and have our own factory. We have both the price advantage of the factory and the thoughtful service of the trading company; and the advantage of taking responsibility.
Q2: How long is your delivery time?
A2: If the goods are in stock, usually 5-10 days. Or if the goods are not in stock, then 15-20 days, depending on the quantity.
Q3: Do you provide samples ?
A3: In this field, we seldom provide samples, but it depands.
Q4:Why choose us?
A4: First,our product quality assurance and warranty for one year, steel structure warranty for lifetime and the price is cheap ;Second,we have 11 years of industry experience, so we are very professional.
Q5:Can we visiting your factory?
A5: We warmly welcome your visiting.

 

 

 

Send your inquiry directly to us

Privacy Policy China Good Quality Flat Top Tower Crane Supplier. Copyright © 2023-2025 towercraneequipment.com . All Rights Reserved.